Shuttle and sorter systems in Dutch logistics hubs

LOGISTICS AUTOMATION · NETHERLANDS
Shuttle and sorter systems in Dutch logistics hubs
The application
Dutch integrators building shuttle systems and cross-belt sorters wire some of the hardest-working drag chains in industry: long travels, high acceleration, and a maintenance window measured in minutes, usually at night.
The challenge
Two different movements meet in the same installation. The sorter travels need a chain cable that survives continuous high-speed flexing, while the palletising robot at the end of the line twists its cables through wrist rotations no chain cable is built for. One specification cannot do both jobs.
The Hyverton build
The travels are wired with EKM71100 high-speed flex. The robot gets two purpose-built constructions: Robot Torsion Cable on the rotating axes and Robot Drag Chain Cable inside the dress pack, both in oil-resistant PUR. Every length is pre-cut to the system drawing with metre marking along the jacket, so a night-shift replacement is a swap, not a measurement exercise.
Products used: EKM71100 High-Speed Flex, Robot Torsion Cable, Robot Drag Chain Cable
Torsion and chain movement specified separately · PUR jackets, oil-resistant · Pre-cut to drawing, metre-marked · Custom runs from 300 m
Frequently asked questions
- Why can’t one cable specification cover both the sorter and the robot?
- The two movements are different jobs. The sorter travels flex continuously at high speed inside a chain, while the palletising robot twists its cables through wrist rotations that no chain cable is built for — so torsion and chain movement are specified separately.
- Which construction goes where?
- The travels run on EKM71100 high-speed flex. The robot’s rotating axes get Robot Torsion Cable, and Robot Drag Chain Cable runs inside the dress pack — both in oil-resistant PUR.
- How does a replacement work during a night shift?
- Every length is pre-cut to the system drawing with metre marking along the jacket, so a replacement is a swap, not a measurement exercise — important when the maintenance window is measured in minutes.
- What is the minimum run for a custom production?
- Custom runs start from 300 m.