The application
Polish builders of CNC routers and edgebanding machines for the furniture industry wire long gantries that never really stop: two shifts, dust-laden air, and a drag chain that carries power, servo and encoder lines side by side.
The challenge
When drive cables and encoder cables share a chain, shielding is not a detail — it is the difference between a machine that holds position and one that faults out mid-panel. The builder also carried cables from three different suppliers, so every spare-parts list was a small research project.
The Hyverton build
One programme now covers the whole chain. The Servo Motor Cable pairs its supply cores with a shielded signal pair for the brake and temperature sensors, the Encoder Cable carries its own matched shielding for interference-free feedback, and the auxiliary axes run on EKM61100 high-flex PVC chain cable. Sets are kitted per machine model, so a replacement order is one line, not a bill of materials.
Products used: Servo Motor Cable, Encoder Cable, EKM61100 High-Flex PVC
Signal pairs shielded · Encoder feedback interference-free by construction · One kit per machine model · Custom runs from 300 m
Frequently asked questions
- Can drive cables and encoder cables share one drag chain?
- Yes — that is how these gantries are wired. The condition is shielding: the Servo Motor Cable pairs its supply cores with a shielded signal pair for the brake and temperature sensors, and the Encoder Cable carries its own matched shielding, so feedback stays interference-free while the two run side by side.
- What runs on the auxiliary axes?
- EKM61100 high-flex PVC chain cable — part of the same programme, so one specification set covers the whole chain.
- How do spare parts and reorders work?
- Sets are kitted per machine model: a replacement order is one line, not a bill of materials — and one programme replaces the three suppliers the builder used before.
- What is the minimum run for a custom production?
- Custom runs start from 300 m.