Custom Cable Assemblies, Made to Drawing: What to Send, What It Costs in Time
Technical guide · Custom cables · Made to drawing
Most of our volume is not catalogue product. Machine builders come to us with a cable that has to fit a specific drag chain, a specific connector set, a specific bending radius — and they need 300 to 3,000 metres, not a container load. This guide explains what to send us, what happens next, and what it costs in time.
1. What “made to drawing” means — and what it does not
A made-to-drawing cable is built around your specification: conductor, cores, shielding, jacket and mechanical duty are chosen for one machine, not taken from a catalogue page. It is not a shortcut around standards: rated voltage, temperature range, flame behaviour and any certification are still confirmed for the construction you ask for. If a catalogue construction already fits, it is usually the faster and cheaper answer — custom work starts where the catalogue stops.
Servo motor cables and encoder cables are the most common made-to-drawing lines: their models are built to the machine, not stocked from a table.
2. What to send: the checklist
Send us the specification you have. A drawing or a photo of the existing cable helps more than a long description — and you do not need a finished drawing to start.
| What to send | What to include | Why it matters |
|---|---|---|
| Drawing or datasheet | Dimensions, conductor cross-section, core count and colours, jacket material | Defines the construction we quote |
| The cable you are replacing | Its part number, or a sample, or a photo with dimensions | Lets us match or improve it without a full drawing |
| Electrical targets | Rated voltage, temperature range, flame behaviour (IEC 60332), LSZH if needed | Decides insulation, approvals and test scope |
| Mechanical duty | Bending cycles, minimum bending radius, torsion rating for robot use | Decides stranding, materials and jacket |
| Shielding | Foil, braided (coverage on request), or combined foil + braid | Decides EMC behaviour and cost |
| Quantity and format | Metres needed (custom runs from 300 m), cut to length or kits, metre marking | Decides price per metre and packing |
3. What it costs in time
| Step | What happens | Timing |
|---|---|---|
| 1 | Send the specification — drawing, datasheet, sample description or part number | When you are ready |
| 2 | Formal quote: construction, price per metre, minimum quantity and delivery time | Usually within one working day |
| 3 | Samples made before bulk production, on request | Agreed in the quote |
| 4 | Bulk production to the agreed construction, cut to length or kitted per drawing | Delivery time stated in the quote |
The honest answer on timing is that the quote is fast and the production time depends on the construction and the quantity — which is why the delivery time is stated in the quote itself, not promised here as a fixed number of days.
4. What decides the price per metre
- Conductor: cross-section, core count, and tinned or bare copper.
- Shielding: foil is the lightest option; braided and combined foil + braid cost more and protect more.
- Jacket: PVC, PUR, TPE or silicone — plus jacket colour and print legend.
- Quantity: custom runs start at 300 m; larger runs spread the same construction over more metres.
- Format: pre-cut lengths and kits, cut to drawing and metre-marked, ready to fit one machine model.
We quote price per metre with the minimum quantity and delivery time in the same document, so the three numbers are always judged together.
5. The mistakes that cost the most
| Mistake | What it causes | Fix |
|---|---|---|
| Sending only a photo, no dimensions | A quote for the wrong construction | Add dimensions, or send a sample |
| Specifying voltage but not movement | A cable that passes the test bench and fails in the chain | State bending cycles, radius and torsion |
| Asking for a catalogue price on a custom build | A price that cannot be honoured | Ask for a formal quote — usually within one working day |
| Ordering below the minimum | A run the factory cannot set up | Plan for 300 m, or combine machines into one order |
| Leaving certification to the end | A construction that cannot carry the mark you need | State the target market and standard in the enquiry |
Frequently asked questions
- What is the minimum order for a custom cable?
- Custom runs start at 300 m. Most custom orders fall between 300 and 3,000 m — the quantities machine builders need for one machine series, not a container load.
- Do I need a finished drawing before I ask for a quote?
- No. A datasheet, a sample description, or the part number of the cable you are replacing is enough to start. A drawing or a photo with dimensions makes the quote faster and more accurate.
- How long until I have a quote?
- Usually within one working day. The quote states the construction, the price per metre, the minimum quantity and the delivery time.
- Can I get a sample before bulk production?
- Yes — samples are made before bulk production on request, so you can check the construction against your machine before committing to the full run.
Send us the drawing — or the cable it replaces
Tell us the machine, the movement and the quantity. We will confirm the construction, quote usually within one working day, and make a sample before bulk production on request.
Custom Cable Manufacturing Request a QuoteRobot assemblies are a large part of this work — our robot cables range covers torsion, servo and encoder lines for robot cells. To compare standard constructions by specification before you send a drawing, open the cable selector.